Snowy Hydro Gas Power Station, Laverton – Victoria

The Snowy Hydro Gas Power Plant at Laverton was a critical fast-start generation asset supporting grid stability, peak demand response and energy security within the National Electricity Market. The facility provides dispatchable power that complements renewable generation and strengthens system reliability.

Post Entry Quarantine (PEQ) Facility, Donnybrook – Victoria

The Post Entry Quarantine (PEQ) Facility is a cornerstone of Australia’s national biosecurity system, providing secure, controlled environments for imported animals and plants. The facility was designed to meet stringent Commonwealth standards for biosecurity, containment, operational resilience, and safety.

Central Pier Demolition, Docklands – Victoria

The Central Pier Demolition Project involved the staged removal of the deteriorated Central Pier structure within Melbourne’s Docklands precinct. The pier had reached the end of its service life and posed safety, navigational and environmental risks within one of Melbourne’s most prominent urban waterfront locations.

Joy Baluch AM Bridge, Port Augusta – South Australia

The Joy Baluch AM Bridge Project comprised the construction of a new bridge and the refurbishment of the existing Joy Baluch Bridge, delivering a resilient, future-ready crossing over the Spencer Gulf at Port Augusta. The dual-bridge solution significantly improved safety, capacity and flood immunity for South Australia’s key north–south transport corridor while maintaining traffic continuity during construction.

River Ferry Terminal Upgrades, Brisbane – Queensland

The Dockside, Mowbray, Southbank and Howard Smith Wharves Ferry Terminal Projects formed part of a broader program to upgrade and modernise river-based public transport infrastructure. The objective of the works was to improve passenger safety, accessibility, operational reliability and resilience of ferry terminals operating in high-use, urban river environments.

Dexus Waterfront Development, Brisbane – Queensland

The Dexus Waterfront Development is a landmark urban project integrating premium commercial development with public realm and waterfront infrastructure in a highly constrained inner-city marine environment. The project required a construction partner capable of delivering technically complex marine works while meeting the architectural, durability and placemaking objectives expected of a tier-one private developer.

Western Treatment Plant 5 West Nutrient Removal Plant (5W NRP), Werribee – Victoria

The 5 West Nutrient Removal Plant (5W NRP) forms a critical component of Melbourne Water’s long-term strategy to modernise wastewater treatment infrastructure at the Western Treatment Plant. The facility replaces the ageing 55E Activated Sludge Plant and introduces advanced, energy-efficient nitrogen removal processes, significantly improving treatment performance while reducing environmental impact.

Tanderrum Bridge, Melbourne – Victoria

Fitzgerald Construction Australia was awarded the design and construction of this bridge which created a major new with direct access from Lower Terrace, Birrarung Marr over Batman Avenue and into Melbourne Park. It was a key part of the $ 338 M investment in Stage Two redevelopment of the precinct.

Spirit of Tasmania GeelongPort, Geelong – Victoria

The brand-new, purpose-designed Spirit of Tasmania Quay terminal is a state-of-the-art passenger and freight terminal, which includes a vehicle marshalling area for 600 cars, and a parking area for 150 semi-trailers. We worked closely with GeelongPort and their designers for more than two years to transform Corio Quay South precinct into the new home of Spirit of Tasmania.