Melbourne Cement Facility Silo D, Port Melbourne – Victoria

The Silo D Project at the Melbourne Cement Facility represents a significant advancement in modern cement storage infrastructure, distinguished by its unprecedented scale, structural complexity, and engineering sophistication. The facility enhances Victoria’s cement logistics capability and establishes a regional benchmark for large-scale industrial infrastructure delivered to contemporary engineering standards.

Western Treatment Plant 5 West Nutrient Removal Plant (5W NRP), Werribee – Victoria

The 5 West Nutrient Removal Plant (5W NRP) forms a critical component of Melbourne Water’s long-term strategy to modernise wastewater treatment infrastructure at the Western Treatment Plant. The facility replaces the ageing 55E Activated Sludge Plant and introduces advanced, energy-efficient nitrogen removal processes, significantly improving treatment performance while reducing environmental impact.

Snowy Hydro Gas Power Station, Laverton – Victoria

The Snowy Hydro Gas Power Plant at Laverton was a critical fast-start generation asset supporting grid stability, peak demand response and energy security within the National Electricity Market. The facility provides dispatchable power that complements renewable generation and strengthens system reliability.

Citylink

The Citylink project is a privately owned electronic toll road situated in the centre of Melbourne. The project commenced in 1996 and was completed in 2000 with an infrastructure value of $2.2 billion.

Eastern Treatment Plant Upgrade

The Eastern Treatment upgrade involved building seven new structures over approximately six hectares of land within the existing Eastern Treatment Plant boundary.